PROJECT: BG161PO003-2.3.02-0152-C0001 "Energy Efficiency through Green Investment in Trade and Manufacturing Cooperative "Briz"
On 16.12.2013 Trade and Manufacturing Cooperative Briz signed an administrative grant contract № BG161PO003-2.3.02-0152-C0001 under the Operational Program "Development of the Competitiveness of the Bulgarian Economy" 2007 - 2013 for the implementation of a project "Energy Efficiency through Green Investments in the Briz TMC.
Expected results after the implementation of the project are:
- Thermally-insulated 627,4 sq. m. walls of the administrative building of TMC "Briz";
- Thermally insulated 886.9 square meters of the roof of the administrative building;
- Replaced 370.8 sq.m. windows of the administrative building ";
- Thermally insulated 1446 square meters of the facades of the production building;
- Replaced 388 sq. m. windows and 332 sq. m transparent roof of the production building;
- Delivered and installed 19 pcs. air-to-air heat pumps in the administrative building;
- Delivered and installed 42 pcs. energy saving lamps with 2100 W power in the Production Hall of the Manufacturing Building;
- Delivered and mounted 50 pcs. stickers and 1 pc. designation plate, in compliance with the contract publicity requirements.
All expected results are met.